Energy

Chhyangdi Hydro Pvt. Ltd.

Chhyangdi Hydropower Private Limited was incorporated as a private limited on 2064/05/16 BS and later converted into a public company as Chhyangdi Hydropower Limited on 2071/03/30. The main objective of the company is to use water resources in optimum level to generate hydropower electricity to fulfill the demand of electricity of the country.

Myagdi Khola Hydro Pvt. Ltd

Jurimba Hydro Pvt. Ltd.

Smart Petrol Services Pvt. Ltd.

Standard Pertol Line pvt. Ltd.

Loading…